Quotes
300 quotes · $817,284
| Quote | Customer | Job | Status | Sent | Valid until | Total inc GST |
|---|---|---|---|---|---|---|
| QT-2539 | Cordell & Sons Building Co | J-1685 LED lighting retrofit | Accepted | 2 Sep 2026 | 2 Oct 2026 | $3,118.50 |
| QT-2536 | Harbourside Property Group | J-1678 Smoke alarm compliance | Accepted | 31 Aug 2026 | 30 Sep 2026 | $1,335.40 |
| QT-2532 | Alexandria Print Works | J-1672 EV charger installation — three phase | Accepted | 28 Aug 2026 | 27 Sep 2026 | $6,734.75 |
| QT-2533 | Rosewood Property Marrickville | J-1679 LED lighting retrofit | Accepted | 28 Aug 2026 | 27 Sep 2026 | $2,378.20 |
| QT-2529 | The Rusty Anchor Hotel | J-1669 After hours emergency attendance | Accepted | 26 Aug 2026 | 25 Sep 2026 | $874.50 |
| QT-2531 | SP 84421 Coogee — Owners Corporation | J-1675 Fault find — no power | Accepted | 26 Aug 2026 | 25 Sep 2026 | $603.90 |
| QT-2528 | Helen Vasquez | J-1668 EV charger install — 19 Tennent Pde | Accepted | 25 Aug 2026 | 24 Sep 2026 | $3,693.80 |
| QT-2526 | Gemma Ellis | J-1665 LED lighting retrofit | Accepted | 24 Aug 2026 | 23 Sep 2026 | $2,732.40 |
| QT-2527 | Ashfield Bakery Co | J-1667 Additional power points | Accepted | 24 Aug 2026 | 23 Sep 2026 | $542.30 |
| QT-2522 | Nick Papadopoulos | J-1658 LED lighting retrofit | Accepted | 19 Aug 2026 | 18 Sep 2026 | $2,778.60 |
| QT-2523 | Alexandria Print Works | J-1662 Level 2 — consumer mains replacement | Accepted | 19 Aug 2026 | 18 Sep 2026 | $2,423.30 |
| QT-2521 | Leichhardt Panel & Paint | J-1661 Emergency and exit light testing | Accepted | 18 Aug 2026 | 17 Sep 2026 | $1,590.60 |
| QT-2518 | Rosewood Property Marrickville | J-1654 Switchboard upgrade | Accepted | 17 Aug 2026 | 16 Sep 2026 | $2,919.40 |
| QT-2519 | SP 84421 Coogee — Owners Corporation | J-1652 EV charger installation — single phase | Accepted | 17 Aug 2026 | 16 Sep 2026 | $3,661.90 |
| QT-2520 | Alexandria Print Works | J-1656 Level 2 — consumer mains replacement | Accepted | 17 Aug 2026 | 16 Sep 2026 | $2,464.00 |
| QT-2516 | Leichhardt Panel & Paint | J-1655 Outdoor and security lighting | Accepted | 14 Aug 2026 | 13 Sep 2026 | $2,051.50 |
| QT-2515 | Botany Cold Storage Pty Ltd | J-1650 EV charger installation — single phase | Accepted | 13 Aug 2026 | 12 Sep 2026 | $3,550.25 |
| QT-2512 | Redfern Community Housing Co-op | J-1646 After hours emergency attendance | Accepted | 12 Aug 2026 | 11 Sep 2026 | $708.40 |
| QT-2513 | Redfern Community Housing Co-op | J-1648 Data cabling — office | Accepted | 12 Aug 2026 | 11 Sep 2026 | $2,731.85 |
| QT-2514 | Newtown Dental Studio | J-1651 Additional power points | Accepted | 12 Aug 2026 | 11 Sep 2026 | $777.70 |
| QT-2510 | Marrickville Montessori Preschool | J-1649 LED lighting retrofit | Accepted | 11 Aug 2026 | 10 Sep 2026 | $2,737.90 |
| QT-2511 | Botany Cold Storage Pty Ltd | J-1645 EV charging — two bays, three phase | Accepted | 11 Aug 2026 | 10 Sep 2026 | $8,846.20 |
| QT-2508 | Newtown Dental Studio | J-1643 Warehouse lighting replacement | Accepted | 10 Aug 2026 | 9 Sep 2026 | $6,982.80 |
| QT-2509 | Maroubra Constructions Pty Ltd | J-1641 EV charger installation — three phase | Accepted | 10 Aug 2026 | 9 Sep 2026 | $8,708.70 |
| QT-2507 | Sarah Lim | J-1639 Switchboard upgrade | Accepted | 7 Aug 2026 | 6 Sep 2026 | $2,926.00 |
| QT-2504 | Enmore Fitness Collective | J-1634 Additional power points | Accepted | 5 Aug 2026 | 4 Sep 2026 | $870.10 |
| QT-2503 | The Rusty Anchor Hotel | J-1631 Outdoor and security lighting | Accepted | 3 Aug 2026 | 2 Sep 2026 | $1,650.00 |
| QT-2498 | Duy Tran | J-1626 Kitchen renovation — rough in and fit off | Accepted | 28 Jul 2026 | 27 Aug 2026 | $4,006.20 |
| QT-2495 | Fiona Wren | J-1624 Switchboard upgrade | Accepted | 27 Jul 2026 | 26 Aug 2026 | $3,245.00 |
| QT-2497 | Andrew Tolhurst | J-1623 Switchboard upgrade | Accepted | 27 Jul 2026 | 26 Aug 2026 | $3,163.60 |
| QT-2494 | Marrickville Montessori Preschool | J-1620 LED lighting retrofit | Accepted | 24 Jul 2026 | 23 Aug 2026 | $2,673.00 |
| QT-2493 | Ben Achterberg | J-1617 EV charger installation — single phase | Accepted | 23 Jul 2026 | 22 Aug 2026 | $3,625.05 |
| QT-2492 | Glebe Point Medical Centre | J-1621 Emergency and exit light testing | Accepted | 22 Jul 2026 | 21 Aug 2026 | $1,557.60 |
| QT-2491 | Nick Papadopoulos | J-1618 Switchboard upgrade | Accepted | 21 Jul 2026 | 20 Aug 2026 | $3,000.80 |
| QT-2486 | Michael O'Rourke | J-1615 Kitchen renovation — rough in and fit off | Accepted | 20 Jul 2026 | 19 Aug 2026 | $4,108.50 |
| QT-2487 | Ashfield Bakery Co | J-1612 Data cabling — office | Accepted | 20 Jul 2026 | 19 Aug 2026 | $3,579.40 |
| QT-2489 | Botany Cold Storage Pty Ltd | J-1613 Level 2 — consumer mains replacement | Accepted | 20 Jul 2026 | 19 Aug 2026 | $2,348.50 |
| QT-2490 | The Rusty Anchor Hotel | J-1611 Level 2 — consumer mains replacement | Accepted | 20 Jul 2026 | 19 Aug 2026 | $2,745.60 |
| QT-2481 | Maroubra Constructions Pty Ltd | J-1605 EV charger installation — three phase | Accepted | 16 Jul 2026 | 15 Aug 2026 | $8,654.80 |
| QT-2483 | Priyanka Shah | J-1607 Switchboard upgrade | Accepted | 16 Jul 2026 | 15 Aug 2026 | $3,388.00 |
| QT-2480 | Fiona Wren | J-1603 Level 2 — consumer mains replacement | Accepted | 14 Jul 2026 | 13 Aug 2026 | $2,742.30 |
| QT-2478 | Ashfield Bakery Co | J-1600 EV charger installation — single phase | Accepted | 13 Jul 2026 | 12 Aug 2026 | $3,587.10 |
| QT-2477 | SP 84421 Coogee — Owners Corporation | J-1596 Outdoor and security lighting | Accepted | 10 Jul 2026 | 9 Aug 2026 | $1,444.30 |
| QT-2473 | Botany Cold Storage Pty Ltd | J-1590 Fault find — no power | Accepted | 8 Jul 2026 | 7 Aug 2026 | $368.50 |
| QT-2474 | Josh Karlsson | J-1591 Kitchen renovation — rough in and fit off | Accepted | 8 Jul 2026 | 7 Aug 2026 | $4,293.30 |
| QT-2471 | Vantage Real Estate Newtown | J-1588 Fault find — no power | Accepted | 6 Jul 2026 | 5 Aug 2026 | $440.00 |
| QT-2469 | Vantage Real Estate Newtown | J-1583 Switchboard upgrade | Accepted | 3 Jul 2026 | 2 Aug 2026 | $3,176.80 |
| QT-2468 | Harbourside Property Group | J-1585 Fault find — no power | Accepted | 2 Jul 2026 | 1 Aug 2026 | $506.00 |
| QT-2465 | Andrew Tolhurst | J-1575 Kitchen renovation — rough in and fit off | Accepted | 29 Jun 2026 | 29 Jul 2026 | $3,417.70 |
| QT-2462 | Maroubra Constructions Pty Ltd | J-1578 Kitchen renovation — rough in and fit off | Accepted | 26 Jun 2026 | 26 Jul 2026 | $4,189.90 |
| QT-2463 | Redfern Community Housing Co-op | J-1579 Emergency and exit light testing | Accepted | 26 Jun 2026 | 26 Jul 2026 | $1,079.10 |
| QT-2459 | Marrickville Montessori Preschool | J-1572 Smoke alarm compliance | Accepted | 23 Jun 2026 | 23 Jul 2026 | $1,796.30 |
| QT-2460 | Rosewood Property Marrickville | J-1573 Additional power points | Accepted | 23 Jun 2026 | 23 Jul 2026 | $759.00 |
| QT-2458 | Ashfield Bakery Co | J-1569 LED lighting retrofit | Accepted | 22 Jun 2026 | 22 Jul 2026 | $2,686.20 |
| QT-2453 | Vantage Real Estate Newtown | J-1565 LED lighting retrofit | Accepted | 15 Jun 2026 | 15 Jul 2026 | $3,268.10 |
| QT-2455 | Tania Beckett | J-1561 Safety switch installation | Accepted | 15 Jun 2026 | 15 Jul 2026 | $684.20 |
| QT-2450 | Harbourside Property Group | J-1562 RCD compliance audit and report | Accepted | 11 Jun 2026 | 11 Jul 2026 | $1,230.35 |
| QT-2449 | Rosewood Property Marrickville | J-1555 Smoke alarm compliance | Accepted | 10 Jun 2026 | 10 Jul 2026 | $2,090.00 |
| QT-2444 | Glebe Point Medical Centre | J-1553 LED lighting retrofit | Accepted | 8 Jun 2026 | 8 Jul 2026 | $2,578.40 |
| QT-2447 | Inner West Strata Services | J-1552 EV charger installation — three phase | Accepted | 8 Jun 2026 | 8 Jul 2026 | $8,647.10 |
| QT-2442 | Helen Vasquez | J-1544 Outdoor and security lighting | Accepted | 5 Jun 2026 | 5 Jul 2026 | $1,587.30 |
| QT-2443 | SP 84421 Coogee — Owners Corporation | J-1550 Level 2 — consumer mains replacement | Accepted | 5 Jun 2026 | 5 Jul 2026 | $2,874.30 |
| QT-2440 | Nick Papadopoulos | J-1548 Switchboard upgrade | Accepted | 4 Jun 2026 | 4 Jul 2026 | $3,228.50 |
| QT-2441 | Two Chimneys Espresso | J-1549 EV charger installation — single phase | Accepted | 4 Jun 2026 | 4 Jul 2026 | $3,768.60 |
| QT-2438 | Glebe Point Medical Centre | J-1547 Smoke alarm compliance | Accepted | 3 Jun 2026 | 3 Jul 2026 | $1,227.60 |
| QT-2436 | Vantage Real Estate Newtown | J-1537 Switchboard upgrade | Accepted | 29 May 2026 | 28 Jun 2026 | $3,309.90 |
| QT-2435 | Redfern Community Housing Co-op | J-1539 Emergency and exit light testing | Accepted | 27 May 2026 | 26 Jun 2026 | $1,401.40 |
| QT-2433 | Rosewood Property Marrickville | J-1535 Fault find — no power | Accepted | 25 May 2026 | 24 Jun 2026 | $492.80 |
| QT-2425 | Inner West Strata Services | J-1523 EV charger installation — single phase | Accepted | 22 May 2026 | 21 Jun 2026 | $3,603.05 |
| QT-2426 | SP 84421 Coogee — Owners Corporation | J-1525 Emergency and exit light testing | Accepted | 22 May 2026 | 21 Jun 2026 | $951.50 |
| QT-2428 | Fiona Wren | J-1534 Switchboard upgrade | Accepted | 22 May 2026 | 21 Jun 2026 | $3,228.50 |
| QT-2429 | Josh Karlsson | J-1530 EV charger installation — single phase | Accepted | 22 May 2026 | 21 Jun 2026 | $3,634.95 |
| QT-2430 | Enmore Fitness Collective | J-1529 Warehouse lighting replacement | Accepted | 22 May 2026 | 21 Jun 2026 | $7,524.00 |
| QT-2432 | Marrickville Montessori Preschool | J-1533 Emergency and exit light testing | Accepted | 22 May 2026 | 21 Jun 2026 | $1,713.80 |
| QT-2423 | Ashfield Bakery Co | J-1526 EV charger installation — single phase | Accepted | 19 May 2026 | 18 Jun 2026 | $3,709.75 |
| QT-2420 | Rosewood Property Marrickville | J-1521 LED lighting retrofit | Accepted | 18 May 2026 | 17 Jun 2026 | $3,132.80 |
| QT-2421 | Glebe Point Medical Centre | J-1520 Data cabling — office | Accepted | 18 May 2026 | 17 Jun 2026 | $2,998.60 |
| QT-2419 | Alexandria Print Works | J-1518 Additional power points | Accepted | 15 May 2026 | 14 Jun 2026 | $719.40 |
| QT-2417 | Glebe Point Medical Centre | J-1515 Emergency and exit light testing | Accepted | 14 May 2026 | 13 Jun 2026 | $1,571.90 |
| QT-2418 | Leichhardt Panel & Paint | J-1519 Emergency and exit light testing | Accepted | 14 May 2026 | 13 Jun 2026 | $1,235.30 |
| QT-2416 | Helen Vasquez | J-1516 Fault find — no power | Accepted | 13 May 2026 | 12 Jun 2026 | $349.80 |
| QT-2415 | Vantage Real Estate Newtown | J-1514 Switchboard upgrade | Accepted | 12 May 2026 | 11 Jun 2026 | $3,085.50 |
| QT-2412 | Tempe Trade Supplies | J-1506 LED lighting retrofit | Accepted | 8 May 2026 | 7 Jun 2026 | $2,687.30 |
| QT-2413 | Tempe Trade Supplies | J-1508 Additional power points | Accepted | 8 May 2026 | 7 Jun 2026 | $915.20 |
| QT-2410 | Helen Vasquez | J-1507 EV charger installation — single phase | Accepted | 7 May 2026 | 6 Jun 2026 | $3,768.60 |
| QT-2409 | Tempe Trade Supplies | J-1509 Smoke alarm compliance | Accepted | 5 May 2026 | 4 Jun 2026 | $1,844.70 |
| QT-2406 | Harbourside Property Group | J-1504 Fault find — no power | Accepted | 30 Apr 2026 | 30 May 2026 | $492.80 |
| QT-2404 | Tempe Trade Supplies | J-1502 EV charger installation — single phase | Accepted | 29 Apr 2026 | 29 May 2026 | $3,661.90 |
| QT-2402 | SP 84421 Coogee — Owners Corporation | J-1497 Switchboard upgrade | Accepted | 24 Apr 2026 | 24 May 2026 | $3,150.40 |
| QT-2401 | Cordell & Sons Building Co | J-1496 Switchboard upgrade | Accepted | 22 Apr 2026 | 22 May 2026 | $3,088.80 |
| QT-2398 | Tempe Trade Supplies | J-1493 Emergency and exit light testing | Accepted | 20 Apr 2026 | 20 May 2026 | $1,576.30 |
| QT-2399 | Maroubra Constructions Pty Ltd | J-1491 Additional power points | Accepted | 20 Apr 2026 | 20 May 2026 | $693.00 |
| QT-2396 | SP 84421 Coogee — Owners Corporation | J-1489 Hot water fault — off peak | Accepted | 17 Apr 2026 | 17 May 2026 | $434.50 |
| QT-2397 | Sarah Lim | J-1492 Smoke alarm compliance | Accepted | 17 Apr 2026 | 17 May 2026 | $1,335.40 |
| QT-2395 | Glebe Point Medical Centre | J-1490 LED lighting retrofit | Accepted | 15 Apr 2026 | 15 May 2026 | $2,795.10 |
| QT-2392 | Michael O'Rourke | J-1481 Outdoor and security lighting | Accepted | 13 Apr 2026 | 13 May 2026 | $1,312.30 |
| QT-2393 | Inner West Strata Services | J-1485 EV charger installation — single phase | Accepted | 13 Apr 2026 | 13 May 2026 | $3,518.35 |
| QT-2387 | Two Chimneys Espresso | J-1473 EV charger installation — three phase | Accepted | 10 Apr 2026 | 10 May 2026 | $8,858.30 |
| QT-2388 | Vantage Real Estate Newtown | J-1478 Switchboard upgrade | Accepted | 10 Apr 2026 | 10 May 2026 | $3,173.50 |
| QT-2389 | SP 84421 Coogee — Owners Corporation | J-1479 Switchboard upgrade | Accepted | 10 Apr 2026 | 10 May 2026 | $2,994.20 |
| QT-2390 | Andrew Tolhurst | J-1483 EV charger installation — single phase | Accepted | 10 Apr 2026 | 10 May 2026 | $3,661.90 |
| QT-2386 | Andrew Tolhurst | J-1480 Kitchen renovation — rough in and fit off | Accepted | 9 Apr 2026 | 9 May 2026 | $4,298.80 |
| QT-2383 | Marrickville Montessori Preschool | J-1472 EV charger installation — single phase | Accepted | 8 Apr 2026 | 8 May 2026 | $3,625.05 |
| QT-2384 | Redfern Community Housing Co-op | J-1475 LED lighting retrofit | Accepted | 8 Apr 2026 | 8 May 2026 | $2,460.70 |
| QT-2385 | Leichhardt Panel & Paint | J-1482 EV charger installation — single phase | Accepted | 8 Apr 2026 | 8 May 2026 | $3,550.25 |
| QT-2381 | Cordell & Sons Building Co | J-1476 Additional power points | Accepted | 7 Apr 2026 | 7 May 2026 | $719.40 |
| QT-2382 | Inner West Strata Services | J-1477 Switchboard upgrade | Accepted | 7 Apr 2026 | 7 May 2026 | $3,102.00 |
| QT-2376 | Cordell & Sons Building Co | J-1465 EV charger installation — three phase | Accepted | 2 Apr 2026 | 2 May 2026 | $8,401.80 |
| QT-2374 | Newtown Dental Studio | J-1466 Outdoor and security lighting | Accepted | 1 Apr 2026 | 1 May 2026 | $2,218.70 |
| QT-2375 | Harbourside Property Group | J-1467 After hours emergency attendance | Accepted | 1 Apr 2026 | 1 May 2026 | $994.40 |
| QT-2371 | Michael O'Rourke | J-1461 Bathroom exhaust fan and heat lamp | Accepted | 30 Mar 2026 | 29 Apr 2026 | $1,152.80 |
| QT-2372 | Botany Cold Storage Pty Ltd | J-1462 Three phase upgrade | Accepted | 30 Mar 2026 | 29 Apr 2026 | $5,463.70 |
| QT-2373 | Alexandria Print Works | J-1460 Warehouse lighting replacement | Accepted | 30 Mar 2026 | 29 Apr 2026 | $7,591.10 |
| QT-2369 | Botany Cold Storage Pty Ltd | J-1450 RCD compliance audit and report | Accepted | 27 Mar 2026 | 26 Apr 2026 | $1,142.90 |
| QT-2370 | Rosewood Property Marrickville | J-1457 Safety switch installation | Accepted | 27 Mar 2026 | 26 Apr 2026 | $823.90 |
| QT-2363 | Rosewood Property Marrickville | J-1453 Safety switch installation | Accepted | 25 Mar 2026 | 24 Apr 2026 | $755.70 |
| QT-2364 | Fiona Wren | J-1455 Fault find — no power | Accepted | 25 Mar 2026 | 24 Apr 2026 | $532.40 |
| QT-2365 | The Rusty Anchor Hotel | J-1458 LED lighting retrofit | Accepted | 25 Mar 2026 | 24 Apr 2026 | $3,300.00 |
| QT-2361 | Botany Cold Storage Pty Ltd | J-1452 Emergency and exit light testing | Accepted | 24 Mar 2026 | 23 Apr 2026 | $1,140.70 |
| QT-2358 | Duy Tran | J-1445 Outdoor and security lighting | Accepted | 23 Mar 2026 | 22 Apr 2026 | $1,653.30 |
| QT-2357 | Botany Cold Storage Pty Ltd | J-1444 EV charger installation — single phase | Accepted | 20 Mar 2026 | 19 Apr 2026 | $3,587.10 |
| QT-2356 | Maroubra Constructions Pty Ltd | J-1442 Switchboard upgrade | Accepted | 19 Mar 2026 | 18 Apr 2026 | $3,153.70 |
| QT-2355 | Tempe Trade Supplies | J-1443 Level 2 — consumer mains replacement | Accepted | 17 Mar 2026 | 16 Apr 2026 | $2,013.00 |
| QT-2354 | Helen Vasquez | J-1440 Outdoor and security lighting | Accepted | 16 Mar 2026 | 15 Apr 2026 | $1,827.10 |
| QT-2353 | Gemma Ellis | J-1435 Switchboard upgrade | Accepted | 13 Mar 2026 | 12 Apr 2026 | $3,319.80 |
| QT-2352 | Maroubra Constructions Pty Ltd | J-1439 LED lighting retrofit | Accepted | 12 Mar 2026 | 11 Apr 2026 | $3,357.20 |
| QT-2350 | Inner West Strata Services | J-1437 EV charger installation — single phase | Accepted | 11 Mar 2026 | 10 Apr 2026 | $3,736.70 |
| QT-2347 | SP 84421 Coogee — Owners Corporation | J-1432 Outdoor and security lighting | Accepted | 10 Mar 2026 | 9 Apr 2026 | $1,719.30 |
| QT-2343 | Harbourside Property Group | J-1427 Bathroom exhaust fan and heat lamp | Accepted | 9 Mar 2026 | 8 Apr 2026 | $1,015.30 |
| QT-2344 | Redfern Community Housing Co-op | J-1430 Smoke alarm compliance | Accepted | 9 Mar 2026 | 8 Apr 2026 | $1,707.20 |
| QT-2345 | Cordell & Sons Building Co | J-1424 Switchboard upgrade | Accepted | 9 Mar 2026 | 8 Apr 2026 | $3,078.90 |
| QT-2340 | Cordell & Sons Building Co | J-1423 Switchboard upgrade | Accepted | 6 Mar 2026 | 5 Apr 2026 | $3,078.90 |
| QT-2339 | Rosewood Property Marrickville | J-1420 Safety switch installation | Accepted | 5 Mar 2026 | 4 Apr 2026 | $823.90 |
| QT-2334 | Marrickville Montessori Preschool | J-1414 EV charger installation — single phase | Accepted | 27 Feb 2026 | 29 Mar 2026 | $3,609.10 |
| QT-2332 | Tempe Trade Supplies | J-1418 Emergency and exit light testing | Accepted | 25 Feb 2026 | 27 Mar 2026 | $1,543.30 |
| QT-2330 | Maroubra Constructions Pty Ltd | J-1412 Additional power points | Accepted | 24 Feb 2026 | 26 Mar 2026 | $666.60 |
| QT-2331 | Fiona Wren | J-1413 Safety switch installation | Accepted | 24 Feb 2026 | 26 Mar 2026 | $684.20 |
| QT-2327 | Ashfield Bakery Co | J-1408 Fault find — no power | Accepted | 23 Feb 2026 | 25 Mar 2026 | $630.30 |
| QT-2328 | Rosewood Property Marrickville | J-1407 LED lighting retrofit | Accepted | 23 Feb 2026 | 25 Mar 2026 | $2,576.20 |
| QT-2325 | The Rusty Anchor Hotel | J-1405 LED lighting retrofit | Accepted | 19 Feb 2026 | 21 Mar 2026 | $2,904.00 |
| QT-2321 | Alexandria Print Works | J-1400 Shop fitout — new lease | Accepted | 18 Feb 2026 | 20 Mar 2026 | $9,683.30 |
| QT-2322 | Alexandria Print Works | J-1403 Additional power points | Accepted | 18 Feb 2026 | 20 Mar 2026 | $817.30 |
| QT-2318 | Cordell & Sons Building Co | J-1394 EV charger installation — three phase | Accepted | 16 Feb 2026 | 18 Mar 2026 | $5,948.80 |
| QT-2319 | Priyanka Shah | J-1398 Fault find — no power | Accepted | 16 Feb 2026 | 18 Mar 2026 | $460.90 |
| QT-2320 | Cordell & Sons Building Co | J-1399 Additional power points | Accepted | 16 Feb 2026 | 18 Mar 2026 | $922.90 |
| QT-2316 | Glebe Point Medical Centre | J-1396 Shop fitout — new lease | Accepted | 13 Feb 2026 | 15 Mar 2026 | $10,421.40 |
| QT-2314 | Michael O'Rourke | J-1395 Ceiling fan installation | Accepted | 11 Feb 2026 | 13 Mar 2026 | $782.10 |
| QT-2313 | Inner West Strata Services | J-1391 RCD compliance audit and report | Accepted | 10 Feb 2026 | 12 Mar 2026 | $827.20 |
| QT-2311 | The Rusty Anchor Hotel | J-1389 Fault find — no power | Accepted | 9 Feb 2026 | 11 Mar 2026 | $630.30 |
| QT-2310 | Botany Cold Storage Pty Ltd | J-1386 EV charger installation — single phase | Accepted | 6 Feb 2026 | 8 Mar 2026 | $3,609.10 |
| QT-2308 | Michael O'Rourke | J-1387 Additional power points | Accepted | 5 Feb 2026 | 7 Mar 2026 | $785.40 |
| QT-2309 | Cordell & Sons Building Co | J-1388 Data cabling — office | Accepted | 5 Feb 2026 | 7 Mar 2026 | $3,170.75 |
| QT-2307 | Michael O'Rourke | J-1385 Safety switch installation | Accepted | 29 Jan 2026 | 28 Feb 2026 | $546.70 |
| QT-2306 | The Rusty Anchor Hotel | J-1381 Three phase upgrade | Accepted | 28 Jan 2026 | 27 Feb 2026 | $5,260.20 |
| QT-2305 | Botany Cold Storage Pty Ltd | J-1382 Shop fitout — new lease | Accepted | 27 Jan 2026 | 26 Feb 2026 | $11,304.70 |
| QT-2304 | Ashfield Bakery Co | J-1380 Emergency and exit light testing | Accepted | 26 Jan 2026 | 25 Feb 2026 | $1,728.10 |
| QT-2303 | Botany Cold Storage Pty Ltd | J-1374 LED lighting retrofit | Accepted | 19 Jan 2026 | 18 Feb 2026 | $2,555.30 |
| QT-2301 | Marrickville Montessori Preschool | J-1376 Outdoor and security lighting | Accepted | 16 Jan 2026 | 15 Feb 2026 | $1,695.10 |
| QT-2299 | The Rusty Anchor Hotel | J-1372 Smoke alarm compliance | Accepted | 13 Jan 2026 | 12 Feb 2026 | $1,413.50 |
| QT-2297 | Enmore Fitness Collective | J-1370 Additional power points | Accepted | 8 Jan 2026 | 7 Feb 2026 | $817.30 |
| QT-2296 | Nick Papadopoulos | J-1369 LED lighting retrofit | Accepted | 7 Jan 2026 | 6 Feb 2026 | $3,152.60 |
| QT-2295 | SP 84421 Coogee — Owners Corporation | J-1366 Safety switch installation | Accepted | 5 Jan 2026 | 4 Feb 2026 | $689.70 |
| QT-2293 | The Rusty Anchor Hotel | J-1361 Smoke alarm compliance | Accepted | 2 Jan 2026 | 1 Feb 2026 | $1,413.50 |
| QT-2294 | Two Chimneys Espresso | J-1364 Additional power points | Accepted | 2 Jan 2026 | 1 Feb 2026 | $896.50 |
| QT-2291 | Harbourside Property Group | J-1363 Safety switch installation | Accepted | 1 Jan 2026 | 31 Jan 2026 | $546.70 |
| QT-2289 | Nick Papadopoulos | J-1359 Smoke alarm compliance | Accepted | 29 Dec 2025 | 28 Jan 2026 | $1,844.70 |
| QT-2288 | Harbourside Property Group | J-1358 Switchboard upgrade | Accepted | 25 Dec 2025 | 24 Jan 2026 | $3,456.20 |
| QT-2286 | Inner West Strata Services | J-1355 Outdoor and security lighting | Accepted | 19 Dec 2025 | 18 Jan 2026 | $1,578.50 |
| QT-2287 | Botany Cold Storage Pty Ltd | J-1356 Emergency and exit light testing | Accepted | 19 Dec 2025 | 18 Jan 2026 | $1,453.10 |
| QT-2285 | Vantage Real Estate Newtown | J-1353 Switchboard upgrade | Accepted | 18 Dec 2025 | 17 Jan 2026 | $2,857.80 |
| QT-2283 | SP 84421 Coogee — Owners Corporation | J-1352 EV charger installation — single phase | Accepted | 17 Dec 2025 | 16 Jan 2026 | $3,427.60 |
| QT-2284 | Sarah Lim | J-1354 Three phase upgrade | Accepted | 17 Dec 2025 | 16 Jan 2026 | $5,693.60 |
| QT-2280 | Redfern Community Housing Co-op | J-1347 Fault find — no power | Accepted | 15 Dec 2025 | 14 Jan 2026 | $460.90 |
| QT-2281 | The Rusty Anchor Hotel | J-1349 Smoke alarm compliance | Accepted | 15 Dec 2025 | 14 Jan 2026 | $1,658.80 |
| QT-2279 | Rosewood Property Marrickville | J-1343 Fault find — no power | Accepted | 12 Dec 2025 | 11 Jan 2026 | $492.80 |
| QT-2278 | Cordell & Sons Building Co | J-1342 Additional power points | Accepted | 11 Dec 2025 | 10 Jan 2026 | $759.00 |
| QT-2276 | Tempe Trade Supplies | J-1344 Data cabling — office | Accepted | 9 Dec 2025 | 8 Jan 2026 | $2,999.70 |
| QT-2277 | Cordell & Sons Building Co | J-1345 Switchboard upgrade | Accepted | 9 Dec 2025 | 8 Jan 2026 | $2,857.80 |
| QT-2275 | Cordell & Sons Building Co | J-1338 Kitchen renovation — rough in and fit off | Accepted | 5 Dec 2025 | 4 Jan 2026 | $4,005.10 |
| QT-2273 | Vantage Real Estate Newtown | J-1335 Smoke alarm compliance | Accepted | 4 Dec 2025 | 3 Jan 2026 | $2,060.30 |
| QT-2274 | Vantage Real Estate Newtown | J-1341 Safety switch installation | Accepted | 4 Dec 2025 | 3 Jan 2026 | $757.90 |
| QT-2271 | Cordell & Sons Building Co | J-1339 Three phase upgrade | Accepted | 3 Dec 2025 | 2 Jan 2026 | $5,839.90 |
| QT-2270 | Ashfield Bakery Co | J-1337 Emergency and exit light testing | Accepted | 2 Dec 2025 | 1 Jan 2026 | $1,278.20 |
| QT-2269 | Leichhardt Panel & Paint | J-1333 Additional power points | Accepted | 1 Dec 2025 | 31 Dec 2025 | $647.90 |
| QT-2267 | Botany Cold Storage Pty Ltd | J-1331 Shop fitout — new lease | Accepted | 28 Nov 2025 | 28 Dec 2025 | $11,858.00 |
| QT-2268 | Alexandria Print Works | J-1332 EV charger installation — single phase | Accepted | 28 Nov 2025 | 28 Dec 2025 | $3,593.15 |
| QT-2266 | Nick Papadopoulos | J-1330 Safety switch installation | Accepted | 26 Nov 2025 | 26 Dec 2025 | $895.40 |
| QT-2265 | Inner West Strata Services | J-1329 Bathroom exhaust fan and heat lamp | Accepted | 25 Nov 2025 | 25 Dec 2025 | $895.40 |
| QT-2263 | Tempe Trade Supplies | J-1326 After hours emergency attendance | Accepted | 24 Nov 2025 | 24 Dec 2025 | $612.70 |
| QT-2261 | Maroubra Constructions Pty Ltd | J-1321 LED lighting retrofit | Accepted | 21 Nov 2025 | 21 Dec 2025 | $3,070.10 |
| QT-2262 | Harbourside Property Group | J-1325 Smoke alarm compliance | Accepted | 21 Nov 2025 | 21 Dec 2025 | $2,197.80 |
| QT-2257 | Marrickville Montessori Preschool | J-1320 Outdoor and security lighting | Accepted | 20 Nov 2025 | 20 Dec 2025 | $1,695.10 |
| QT-2258 | Rosewood Property Marrickville | J-1323 LED lighting retrofit | Accepted | 20 Nov 2025 | 20 Dec 2025 | $2,915.00 |
| QT-2256 | Rosewood Property Marrickville | J-1322 Smoke alarm compliance | Accepted | 19 Nov 2025 | 19 Dec 2025 | $1,305.70 |
| QT-2252 | Gemma Ellis | J-1312 Fault find — no power | Accepted | 17 Nov 2025 | 17 Dec 2025 | $323.40 |
| QT-2254 | Duy Tran | J-1314 Fault find — no power | Accepted | 17 Nov 2025 | 17 Dec 2025 | $577.50 |
| QT-2250 | Two Chimneys Espresso | J-1306 Outdoor and security lighting | Accepted | 14 Nov 2025 | 14 Dec 2025 | $1,907.40 |
| QT-2251 | Glebe Point Medical Centre | J-1311 Three phase upgrade | Accepted | 14 Nov 2025 | 14 Dec 2025 | $5,927.90 |
| QT-2247 | Two Chimneys Espresso | J-1307 LED lighting retrofit | Accepted | 13 Nov 2025 | 13 Dec 2025 | $3,039.30 |
| QT-2248 | Botany Cold Storage Pty Ltd | J-1310 LED lighting retrofit | Accepted | 13 Nov 2025 | 13 Dec 2025 | $2,933.70 |
| QT-2246 | Priyanka Shah | J-1309 Outdoor and security lighting | Accepted | 11 Nov 2025 | 11 Dec 2025 | $1,653.30 |
| QT-2243 | Inner West Strata Services | J-1305 Emergency and exit light testing | Accepted | 10 Nov 2025 | 10 Dec 2025 | $1,074.70 |
| QT-2242 | Cordell & Sons Building Co | J-1303 Kitchen renovation — rough in and fit off | Accepted | 7 Nov 2025 | 7 Dec 2025 | $3,729.00 |
| QT-2240 | Ashfield Bakery Co | J-1302 LED lighting retrofit | Accepted | 3 Nov 2025 | 3 Dec 2025 | $2,343.00 |
| QT-2238 | Inner West Strata Services | J-1294 Safety switch installation | Accepted | 31 Oct 2025 | 30 Nov 2025 | $755.70 |
| QT-2236 | Redfern Community Housing Co-op | J-1298 LED lighting retrofit | Accepted | 30 Oct 2025 | 29 Nov 2025 | $3,402.30 |
| QT-2233 | Rosewood Property Marrickville | J-1295 Switchboard upgrade | Accepted | 29 Oct 2025 | 28 Nov 2025 | $2,867.70 |
| QT-2232 | Inner West Strata Services | J-1292 Emergency and exit light testing | Accepted | 28 Oct 2025 | 27 Nov 2025 | $1,296.90 |
| QT-2231 | Leichhardt Panel & Paint | J-1290 Outdoor and security lighting | Accepted | 27 Oct 2025 | 26 Nov 2025 | $1,860.10 |
| QT-2230 | Gemma Ellis | J-1288 Smoke alarm compliance | Accepted | 24 Oct 2025 | 23 Nov 2025 | $1,227.60 |
| QT-2229 | Cordell & Sons Building Co | J-1291 Three phase upgrade | Accepted | 23 Oct 2025 | 22 Nov 2025 | $6,002.70 |
| QT-2228 | SP 84421 Coogee — Owners Corporation | J-1287 After hours emergency attendance | Accepted | 22 Oct 2025 | 21 Nov 2025 | $1,041.70 |
| QT-2227 | Harbourside Property Group | J-1285 Switchboard upgrade | Accepted | 21 Oct 2025 | 20 Nov 2025 | $3,017.30 |
| QT-2225 | Harbourside Property Group | J-1280 After hours emergency attendance | Accepted | 20 Oct 2025 | 19 Nov 2025 | $779.90 |
| QT-2226 | Inner West Strata Services | J-1283 Bathroom exhaust fan and heat lamp | Accepted | 20 Oct 2025 | 19 Nov 2025 | $1,032.90 |
| QT-2220 | Leichhardt Panel & Paint | J-1273 Level 2 — consumer mains replacement | Accepted | 16 Oct 2025 | 15 Nov 2025 | $2,162.60 |
| QT-2221 | Two Chimneys Espresso | J-1278 Emergency and exit light testing | Accepted | 16 Oct 2025 | 15 Nov 2025 | $1,372.80 |
| QT-2222 | Inner West Strata Services | J-1281 EV charger installation — three phase | Accepted | 16 Oct 2025 | 15 Nov 2025 | $8,395.20 |
| QT-2217 | Marrickville Montessori Preschool | J-1272 Additional power points | Accepted | 14 Oct 2025 | 13 Nov 2025 | $994.40 |
| QT-2218 | Newtown Dental Studio | J-1274 LED lighting retrofit | Accepted | 14 Oct 2025 | 13 Nov 2025 | $3,282.40 |
| QT-2216 | The Rusty Anchor Hotel | J-1268 After hours emergency attendance | Accepted | 13 Oct 2025 | 12 Nov 2025 | $1,113.20 |
| QT-2214 | Tempe Trade Supplies | J-1264 Level 2 — consumer mains replacement | Accepted | 10 Oct 2025 | 9 Nov 2025 | $2,013.00 |
| QT-2212 | The Rusty Anchor Hotel | J-1265 Outdoor and security lighting | Accepted | 8 Oct 2025 | 7 Nov 2025 | $1,378.30 |
| QT-2209 | Two Chimneys Espresso | J-1262 Three phase upgrade | Accepted | 6 Oct 2025 | 5 Nov 2025 | $5,335.00 |
| QT-2211 | Harbourside Property Group | J-1258 Smoke alarm compliance | Accepted | 6 Oct 2025 | 5 Nov 2025 | $1,472.90 |
| QT-2206 | Ashfield Bakery Co | J-1251 EV charger installation — single phase | Accepted | 3 Oct 2025 | 2 Nov 2025 | $3,427.60 |
| QT-2208 | Two Chimneys Espresso | J-1260 Smoke alarm compliance | Accepted | 3 Oct 2025 | 2 Nov 2025 | $1,276.00 |
| QT-2205 | Leichhardt Panel & Paint | J-1257 Outdoor and security lighting | Accepted | 2 Oct 2025 | 1 Nov 2025 | $1,296.90 |
| QT-2202 | Enmore Fitness Collective | J-1253 Outdoor and security lighting | Accepted | 1 Oct 2025 | 31 Oct 2025 | $1,369.50 |
| QT-2200 | Leichhardt Panel & Paint | J-1248 RCD compliance audit and report | Accepted | 29 Sep 2025 | 29 Oct 2025 | $1,212.20 |
| QT-2195 | Rosewood Property Marrickville | J-1241 Smoke alarm compliance | Accepted | 25 Sep 2025 | 25 Oct 2025 | $1,815.00 |
| QT-2196 | Vantage Real Estate Newtown | J-1244 Ceiling fan installation | Accepted | 25 Sep 2025 | 25 Oct 2025 | $662.20 |
| QT-2197 | Helen Vasquez | J-1245 Bathroom exhaust fan and heat lamp | Accepted | 25 Sep 2025 | 25 Oct 2025 | $1,032.90 |
| QT-2198 | Inner West Strata Services | J-1247 EV charger installation — single phase | Accepted | 25 Sep 2025 | 25 Oct 2025 | $3,634.95 |
| QT-2194 | Andrew Tolhurst | J-1239 Switchboard upgrade | Accepted | 23 Sep 2025 | 23 Oct 2025 | $3,157.00 |
| QT-2192 | Fiona Wren | J-1240 EV charger installation — single phase | Accepted | 22 Sep 2025 | 22 Oct 2025 | $3,693.80 |
| QT-2188 | Harbourside Property Group | J-1232 Bathroom exhaust fan and heat lamp | Accepted | 15 Sep 2025 | 15 Oct 2025 | $1,170.40 |
| QT-2186 | Harbourside Property Group | J-1229 Smoke alarm compliance | Accepted | 12 Sep 2025 | 12 Oct 2025 | $1,335.40 |
| QT-2187 | SP 84421 Coogee — Owners Corporation | J-1230 Safety switch installation | Accepted | 12 Sep 2025 | 12 Oct 2025 | $827.20 |
| QT-2181 | Inner West Strata Services | J-1227 Smoke alarm compliance | Accepted | 10 Sep 2025 | 10 Oct 2025 | $1,335.40 |
| QT-2179 | Ben Achterberg | J-1224 Smoke alarm compliance | Accepted | 8 Sep 2025 | 8 Oct 2025 | $1,796.30 |
| QT-2180 | Marrickville Montessori Preschool | J-1223 Emergency and exit light testing | Accepted | 8 Sep 2025 | 8 Oct 2025 | $814.00 |
| QT-2177 | Maroubra Constructions Pty Ltd | J-1218 Additional power points | Accepted | 5 Sep 2025 | 5 Oct 2025 | $941.60 |
| QT-2176 | Duy Tran | J-1219 Fault find — no power | Accepted | 2 Sep 2025 | 2 Oct 2025 | $440.00 |
| QT-2175 | The Rusty Anchor Hotel | J-1216 Fault find — no power | Accepted | 1 Sep 2025 | 1 Oct 2025 | $492.80 |
| QT-2173 | SP 84421 Coogee — Owners Corporation | J-1215 Bathroom exhaust fan and heat lamp | Accepted | 29 Aug 2025 | 28 Sep 2025 | $1,015.30 |
| QT-2169 | The Rusty Anchor Hotel | J-1213 Outdoor and security lighting | Accepted | 26 Aug 2025 | 25 Sep 2025 | $1,587.30 |
| QT-2170 | Tania Beckett | J-1211 Fault find — no power | Accepted | 26 Aug 2025 | 25 Sep 2025 | $532.40 |
| QT-2165 | Glebe Point Medical Centre | J-1208 Warehouse lighting replacement | Accepted | 25 Aug 2025 | 24 Sep 2025 | $7,437.10 |
| QT-2167 | Nick Papadopoulos | J-1209 EV charger installation — single phase | Accepted | 25 Aug 2025 | 24 Sep 2025 | $3,693.80 |
| QT-2164 | Josh Karlsson | J-1199 Kitchen renovation — rough in and fit off | Accepted | 22 Aug 2025 | 21 Sep 2025 | $4,255.90 |
| QT-2163 | Ashfield Bakery Co | J-1202 LED lighting retrofit | Accepted | 21 Aug 2025 | 20 Sep 2025 | $2,706.00 |
| QT-2161 | Sarah Lim | J-1201 LED lighting retrofit | Accepted | 20 Aug 2025 | 19 Sep 2025 | $2,446.40 |
| QT-2159 | Alexandria Print Works | J-1203 Level 2 — consumer mains replacement | Accepted | 19 Aug 2025 | 18 Sep 2025 | $2,498.10 |
| QT-2158 | Cordell & Sons Building Co | J-1197 Switchboard upgrade | Accepted | 18 Aug 2025 | 17 Sep 2025 | $2,851.20 |
| QT-2156 | Glebe Point Medical Centre | J-1193 LED lighting retrofit | Accepted | 15 Aug 2025 | 14 Sep 2025 | $3,185.60 |
| QT-2157 | Marrickville Montessori Preschool | J-1196 EV charger installation — single phase | Accepted | 15 Aug 2025 | 14 Sep 2025 | $3,768.60 |
| QT-2152 | Nick Papadopoulos | J-1192 Bathroom exhaust fan and heat lamp | Accepted | 12 Aug 2025 | 11 Sep 2025 | $877.80 |
| QT-2153 | Rosewood Property Marrickville | J-1194 Smoke alarm compliance | Accepted | 12 Aug 2025 | 11 Sep 2025 | $1,090.10 |
| QT-2147 | Glebe Point Medical Centre | J-1182 Solar installation 6.6kW | Accepted | 8 Aug 2025 | 7 Sep 2025 | $11,507.10 |
| QT-2148 | Inner West Strata Services | J-1187 EV charger installation — three phase | Accepted | 8 Aug 2025 | 7 Sep 2025 | $8,363.30 |
| QT-2149 | Glebe Point Medical Centre | J-1188 Data cabling — office | Accepted | 8 Aug 2025 | 7 Sep 2025 | $2,947.45 |
| QT-2141 | Harbourside Property Group | J-1177 Smoke alarm compliance | Accepted | 4 Aug 2025 | 3 Sep 2025 | $1,090.10 |
| QT-2142 | Cordell & Sons Building Co | J-1181 Switchboard upgrade | Accepted | 4 Aug 2025 | 3 Sep 2025 | $3,163.60 |
| QT-2143 | Botany Cold Storage Pty Ltd | J-1175 Solar installation 6.6kW | Accepted | 4 Aug 2025 | 3 Sep 2025 | $11,181.50 |
| QT-2138 | SP 84421 Coogee — Owners Corporation | J-1178 RCD compliance audit and report | Accepted | 1 Aug 2025 | 31 Aug 2025 | $1,211.10 |
| QT-2139 | Harbourside Property Group | J-1179 EV charger installation — three phase | Accepted | 1 Aug 2025 | 31 Aug 2025 | $6,184.20 |
| QT-2137 | Inner West Strata Services | J-1170 Switchboard upgrade | Accepted | 31 Jul 2025 | 30 Aug 2025 | $2,942.50 |
| QT-2136 | Botany Cold Storage Pty Ltd | J-1174 Three phase upgrade | Accepted | 29 Jul 2025 | 28 Aug 2025 | $5,555.00 |
| QT-2134 | Glebe Point Medical Centre | J-1167 Smoke alarm compliance | Accepted | 28 Jul 2025 | 27 Aug 2025 | $1,982.20 |
| QT-2131 | Marrickville Montessori Preschool | J-1163 Shop fitout — new lease | Accepted | 25 Jul 2025 | 24 Aug 2025 | $9,858.20 |
| QT-2132 | Tempe Trade Supplies | J-1168 Emergency and exit light testing | Accepted | 25 Jul 2025 | 24 Aug 2025 | $1,093.40 |
| QT-2133 | SP 84421 Coogee — Owners Corporation | J-1166 Switchboard upgrade | Accepted | 25 Jul 2025 | 24 Aug 2025 | $3,069.00 |
| QT-2127 | Harbourside Property Group | J-1161 Smoke alarm compliance | Accepted | 21 Jul 2025 | 20 Aug 2025 | $1,766.60 |
| QT-2125 | Redfern Community Housing Co-op | J-1158 Data cabling — office | Accepted | 18 Jul 2025 | 17 Aug 2025 | $2,960.10 |
| QT-2126 | Enmore Fitness Collective | J-1160 Data cabling — office | Accepted | 18 Jul 2025 | 17 Aug 2025 | $3,022.80 |
| QT-2122 | Leichhardt Panel & Paint | J-1154 Emergency and exit light testing | Accepted | 14 Jul 2025 | 13 Aug 2025 | $1,112.10 |
| QT-2123 | Redfern Community Housing Co-op | J-1156 Smoke alarm compliance | Accepted | 14 Jul 2025 | 13 Aug 2025 | $1,629.10 |
| QT-2120 | Maroubra Constructions Pty Ltd | J-1150 Three phase upgrade | Accepted | 11 Jul 2025 | 10 Aug 2025 | $6,440.50 |
| QT-2121 | Leichhardt Panel & Paint | J-1155 LED lighting retrofit | Accepted | 11 Jul 2025 | 10 Aug 2025 | $2,446.40 |
| QT-2118 | Redfern Community Housing Co-op | J-1149 Three phase upgrade | Accepted | 10 Jul 2025 | 9 Aug 2025 | $5,314.10 |
| QT-2119 | Fiona Wren | J-1152 Safety switch installation | Accepted | 10 Jul 2025 | 9 Aug 2025 | $757.90 |
| QT-2116 | Harbourside Property Group | J-1151 Emergency and exit light testing | Accepted | 9 Jul 2025 | 8 Aug 2025 | $629.20 |
| QT-2117 | Leichhardt Panel & Paint | J-1153 EV charger installation — three phase | Accepted | 9 Jul 2025 | 8 Aug 2025 | $9,027.70 |
| QT-2115 | Two Chimneys Espresso | J-1147 Warehouse lighting replacement | Accepted | 7 Jul 2025 | 6 Aug 2025 | $7,058.70 |
| QT-2113 | Helen Vasquez | J-1143 Bathroom exhaust fan and heat lamp | Accepted | 4 Jul 2025 | 3 Aug 2025 | $1,170.40 |
| QT-2114 | Maroubra Constructions Pty Ltd | J-1145 Additional power points | Accepted | 4 Jul 2025 | 3 Aug 2025 | $732.60 |
| QT-2112 | Helen Vasquez | J-1148 Three phase upgrade | Accepted | 3 Jul 2025 | 2 Aug 2025 | $5,745.30 |
| QT-2111 | Tempe Trade Supplies | J-1146 EV charger installation — single phase | Accepted | 2 Jul 2025 | 1 Aug 2025 | $3,443.55 |
| QT-2107 | Tania Beckett | J-1134 Three phase upgrade | Accepted | 27 Jun 2025 | 27 Jul 2025 | $6,694.60 |
| QT-2108 | Leichhardt Panel & Paint | J-1137 EV charger installation — single phase | Accepted | 27 Jun 2025 | 27 Jul 2025 | $3,693.80 |
| QT-2106 | Tania Beckett | J-1139 Hot water fault — off peak | Accepted | 26 Jun 2025 | 26 Jul 2025 | $434.50 |
| QT-2104 | Harbourside Property Group | J-1136 After hours emergency attendance | Accepted | 24 Jun 2025 | 24 Jul 2025 | $588.50 |
| QT-2102 | Botany Cold Storage Pty Ltd | J-1130 Smoke alarm compliance | Accepted | 23 Jun 2025 | 23 Jul 2025 | $2,090.00 |
| QT-2103 | Rosewood Property Marrickville | J-1133 Switchboard upgrade | Accepted | 23 Jun 2025 | 23 Jul 2025 | $3,235.10 |
| QT-2099 | Botany Cold Storage Pty Ltd | J-1127 Smoke alarm compliance | Accepted | 18 Jun 2025 | 18 Jul 2025 | $1,952.50 |
| QT-2095 | Harbourside Property Group | J-1124 Bathroom exhaust fan and heat lamp | Accepted | 16 Jun 2025 | 16 Jul 2025 | $1,170.40 |
| QT-2096 | Marrickville Montessori Preschool | J-1122 Smoke alarm compliance | Accepted | 16 Jun 2025 | 16 Jul 2025 | $1,365.10 |
| QT-2093 | Botany Cold Storage Pty Ltd | J-1115 Smoke alarm compliance | Accepted | 13 Jun 2025 | 13 Jul 2025 | $1,383.80 |
| QT-2094 | Botany Cold Storage Pty Ltd | J-1117 Three phase upgrade | Accepted | 13 Jun 2025 | 13 Jul 2025 | $5,286.60 |