Harbourline
Electrical · Marrickville
Run the week
◧
Dashboard
▤
Scheduler
▣
Jobs
95
Money
◈
Quotes
19
◆
Invoices
13
Records
◐
Customers
☰
Price list
Assistant
✎
Draft a quote
▨
Read a job sheet
⌕
Ask the data
◔
Monday briefing
✓
Approval queue
Setup
⇪
Import spreadsheet
Public sandbox.
Changes you make here are real, and are yours alone. The demo clears itself down as it goes, so do what you like to it. If something you created disappears, that is why.
J-1139 · Hot water fault — off peak
Tania Beckett
· 33 Excelsior Parade, Marrickville
Paid
What the job is
Home — no hot water since the weekend.
Note:
contactor stuck, element still good
Priced from the catalogue
Code
Description
Qty
Unit
Amount
LAB-CALL
Call out (first hour included)
labour
1
$145.00
$145.00
Edit
Remove
LAB-ELEC
Electrician
labour
2
$125.00
$250.00
Edit
Remove
Subtotal
$395.00
GST
$39.50
Total inc GST
$434.50
Estimated cost / margin
$186.00 · 53%
Add from the price list…
ORANGE-16 — Orange circular conduit 16mm, 4m length ($14.50/len)
TPS-1.5 — TPS twin & earth 1.5mm, 100m roll ($142.00/roll)
TPS-2.5 — TPS twin & earth 2.5mm, 100m roll ($195.00/roll)
TPS-6 — TPS twin & earth 6mm, 50m roll ($305.00/roll)
CAT6-305 — Cat6 UTP cable, 305m box ($285.00/box)
RJ45-WP — Cat6 wall plate and jack ($42.00/ea)
EV-22KW — EV charger 22kW, three phase ($2,050.00/ea)
EV-7KW — EV charger 7kW, single phase, OCPP ($1,450.00/ea)
EV-CT-CLAMP — Load management CT clamp kit ($175.00/ea)
EMERG-LT — Emergency light, LED spitfire ($142.00/ea)
EXIT-LED — Exit sign, LED, maintained ($155.00/ea)
LED-BATT-4 — LED batten 1200mm 36W ($82.00/ea)
SW-DIM — LED compatible dimmer ($86.00/ea)
LED-DL-10 — LED downlight 10W, dimmable, tri-colour ($52.00/ea)
LED-DL-13 — LED downlight 13W, IC-4 rated ($64.00/ea)
LED-FLOOD-50 — LED floodlight 50W with sensor ($128.00/ea)
SEN-PIR — PIR motion sensor, 360 degree ($95.00/ea)
CEIL-FAN-DC — DC ceiling fan with remote ($320.00/ea)
GPO-D — Double power point 10A, white ($24.00/ea)
GPO-D-USB — Double power point with USB-A/C ($78.00/ea)
EXH-FAN-250 — Inline exhaust fan kit, 250mm ($265.00/ea)
SW-1G — Light switch, 1 gang ($16.00/ea)
HWS-TIMER — Off-peak hot water timer and contactor ($168.00/ea)
GPO-WP — Weatherproof double power point, IP54 ($68.00/ea)
MCB-16 — Circuit breaker 16A ($22.00/ea)
RCBO-16 — RCBO 16A 30mA, single pole ($62.00/ea)
RCBO-20 — RCBO 20A 30mA, single pole ($65.00/ea)
RCBO-32 — RCBO 32A 30mA, double pole ($105.00/ea)
SPD-T2 — Surge protection device, Type 2 ($245.00/ea)
SMOKE-240 — Smoke alarm 240V photoelectric, 10yr battery ($98.00/ea)
SOL-INV-5 — Solar inverter 5kW hybrid ($1,780.00/ea)
SOL-RAIL-4 — Solar mounting rail 4.2m ($62.00/ea)
SOL-PANEL-440 — Solar panel 440W mono ($235.00/ea)
SWB-3PH-36 — Distribution board, three phase, 36 pole ($690.00/ea)
MAIN-SW-63 — Main switch, 63A double pole ($88.00/ea)
SWB-MTR-1P — Meter panel upgrade kit, single phase ($410.00/ea)
SWB-CLIP-24 — Switchboard enclosure, 24 pole, flush mount ($285.00/ea)
LAB-AH — After hours / weekend electrician ($195.00/hr)
LAB-APP — Apprentice ($68.00/hr)
LAB-CALL — Call out (first hour included) ($145.00/ea)
LAB-COMP — Compliance certificate and paperwork ($55.00/ea)
LAB-ELEC — Electrician ($125.00/hr)
LAB-EWP — Elevated work platform hire and operator ($680.00/day)
LAB-L2 — Level 2 authorised service work ($185.00/hr)
LAB-SNR — Senior electrician / A-grade ($145.00/hr)
LAB-TEST — Test and tag, per item ($4.50/ea)
Add line
Paperwork
Document
Status
Issued
Due / valid to
Total
QT-2106
quote
Accepted
26 Jun 2025
26 Jul 2025
$434.50
INV-4097
invoice
Paid
7 Aug 2025
14 Aug 2025
$399.74
Move it along
This job is closed. Nothing further to do.
Allowed next steps only. The lifecycle is enforced, so a job can never be in two states at once.
Raise another quote
Raise another invoice
Detail
Logged
24 Jun 2025 by phone
Quoted
26 Jun 2025
Booked
28 Jul 2025
Completed
28 Jul 2025
Invoiced
7 Aug 2025
Paid
23 Aug 2025
Lead
Jess Moreau
Category
Service
Terms
7 days
Origin
migrated history
Who is on it
JM
Jess Moreau
Mon 28 Jul
2h
What happened
23 Aug 2025 · PR
Payment received
7 Aug 2025 · PR
Invoice raised
28 Jul 2025 · JM
Work completed by JM
28 Jul 2025 · SW
Booked in for 2025-07-28
26 Jun 2025 · DN
Quote issued
24 Jun 2025 · SW
Enquiry received by phone