Harbourline
Electrical · Marrickville
Run the week
◧
Dashboard
▤
Scheduler
▣
Jobs
95
Money
◈
Quotes
19
◆
Invoices
13
Records
◐
Customers
☰
Price list
Assistant
✎
Draft a quote
▨
Read a job sheet
⌕
Ask the data
◔
Monday briefing
✓
Approval queue
Setup
⇪
Import spreadsheet
Public sandbox.
Changes you make here are real, and are yours alone. The demo clears itself down as it goes, so do what you like to it. If something you created disappears, that is why.
J-1080 · Hot water fault — off peak
Rosewood Property Marrickville
· 91 Warren Road, Marrickville
Paid
High
What the job is
91 Warren Rd — no hot water since the weekend.
Note:
no hot water since the weekend
Priced from the catalogue
Code
Description
Qty
Unit
Amount
LAB-CALL
Call out (first hour included)
labour
1
$145.00
$145.00
Edit
Remove
LAB-ELEC
Electrician
labour
1
$125.00
$125.00
Edit
Remove
Subtotal
$270.00
GST
$27.00
Total inc GST
$297.00
Estimated cost / margin
$124.00 · 54%
Add from the price list…
ORANGE-16 — Orange circular conduit 16mm, 4m length ($14.50/len)
TPS-1.5 — TPS twin & earth 1.5mm, 100m roll ($142.00/roll)
TPS-2.5 — TPS twin & earth 2.5mm, 100m roll ($195.00/roll)
TPS-6 — TPS twin & earth 6mm, 50m roll ($305.00/roll)
CAT6-305 — Cat6 UTP cable, 305m box ($285.00/box)
RJ45-WP — Cat6 wall plate and jack ($42.00/ea)
EV-22KW — EV charger 22kW, three phase ($2,050.00/ea)
EV-7KW — EV charger 7kW, single phase, OCPP ($1,450.00/ea)
EV-CT-CLAMP — Load management CT clamp kit ($175.00/ea)
EMERG-LT — Emergency light, LED spitfire ($142.00/ea)
EXIT-LED — Exit sign, LED, maintained ($155.00/ea)
LED-BATT-4 — LED batten 1200mm 36W ($82.00/ea)
SW-DIM — LED compatible dimmer ($86.00/ea)
LED-DL-10 — LED downlight 10W, dimmable, tri-colour ($52.00/ea)
LED-DL-13 — LED downlight 13W, IC-4 rated ($64.00/ea)
LED-FLOOD-50 — LED floodlight 50W with sensor ($128.00/ea)
SEN-PIR — PIR motion sensor, 360 degree ($95.00/ea)
CEIL-FAN-DC — DC ceiling fan with remote ($320.00/ea)
GPO-D — Double power point 10A, white ($24.00/ea)
GPO-D-USB — Double power point with USB-A/C ($78.00/ea)
EXH-FAN-250 — Inline exhaust fan kit, 250mm ($265.00/ea)
SW-1G — Light switch, 1 gang ($16.00/ea)
HWS-TIMER — Off-peak hot water timer and contactor ($168.00/ea)
GPO-WP — Weatherproof double power point, IP54 ($68.00/ea)
MCB-16 — Circuit breaker 16A ($22.00/ea)
RCBO-16 — RCBO 16A 30mA, single pole ($62.00/ea)
RCBO-20 — RCBO 20A 30mA, single pole ($65.00/ea)
RCBO-32 — RCBO 32A 30mA, double pole ($105.00/ea)
SPD-T2 — Surge protection device, Type 2 ($245.00/ea)
SMOKE-240 — Smoke alarm 240V photoelectric, 10yr battery ($98.00/ea)
SOL-INV-5 — Solar inverter 5kW hybrid ($1,780.00/ea)
SOL-RAIL-4 — Solar mounting rail 4.2m ($62.00/ea)
SOL-PANEL-440 — Solar panel 440W mono ($235.00/ea)
SWB-3PH-36 — Distribution board, three phase, 36 pole ($690.00/ea)
MAIN-SW-63 — Main switch, 63A double pole ($88.00/ea)
SWB-MTR-1P — Meter panel upgrade kit, single phase ($410.00/ea)
SWB-CLIP-24 — Switchboard enclosure, 24 pole, flush mount ($285.00/ea)
LAB-AH — After hours / weekend electrician ($195.00/hr)
LAB-APP — Apprentice ($68.00/hr)
LAB-CALL — Call out (first hour included) ($145.00/ea)
LAB-COMP — Compliance certificate and paperwork ($55.00/ea)
LAB-ELEC — Electrician ($125.00/hr)
LAB-EWP — Elevated work platform hire and operator ($680.00/day)
LAB-L2 — Level 2 authorised service work ($185.00/hr)
LAB-SNR — Senior electrician / A-grade ($145.00/hr)
LAB-TEST — Test and tag, per item ($4.50/ea)
Add line
Paperwork
Document
Status
Issued
Due / valid to
Total
INV-4047
invoice
Paid
31 May 2025
14 Jun 2025
$297.00
Move it along
This job is closed. Nothing further to do.
Allowed next steps only. The lifecycle is enforced, so a job can never be in two states at once.
Raise a quote
Raise another invoice
Detail
Logged
12 May 2025 by phone
Quoted
—
Booked
23 May 2025
Completed
23 May 2025
Invoiced
31 May 2025
Paid
11 Jun 2025
Lead
Mick Farrelly
Category
Service
Terms
14 days
Origin
migrated history
Who is on it
MF
Mick Farrelly
Fri 23 May
2h
What happened
11 Jun 2025 · PR
Payment received
31 May 2025 · PR
Invoice raised
23 May 2025 · MF
Work completed by MF
23 May 2025 · SW
Booked in for 2025-05-23
12 May 2025 · SW
Enquiry received by phone