J-1653 · Three phase upgrade — cold store switchroom

Botany Cold Storage Pty Ltd · 210 Coward Street, Mascot
QuotedHigh

What the job is

Existing board at capacity. New 36 pole three phase DB, meter panel and sub mains to the compressor room.

Note: Hamish needs board approval before he can sign. Chased once on 1 Sep.

Priced from the catalogue

CodeDescriptionQtyUnitAmount
SWB-3PH-36Distribution board, three phase, 36 pole1$690.00$690.00
SWB-MTR-1PMeter panel upgrade kit, single phase1$410.00$410.00
RCBO-32RCBO 32A 30mA, double pole4$105.00$420.00
MAIN-SW-63Main switch, 63A double pole1$88.00$88.00
TPS-6TPS twin & earth 6mm, 50m roll2$305.00$610.00
SPD-T2Surge protection device, Type 21$245.00$245.00
LAB-L2Level 2 authorised service worklabour8$185.00$1,480.00
LAB-SNRSenior electrician / A-gradelabour14$145.00$2,030.00
LAB-ELECElectricianlabour12$125.00$1,500.00
LAB-APPApprenticelabour10$68.00$680.00
LAB-COMPCompliance certificate and paperworklabour1$55.00$55.00
Subtotal$8,208.00
GST$820.80
Total inc GST$9,028.80
Estimated cost / margin$4,260.00 · 48%

Paperwork

DocumentStatusIssuedDue / valid toTotal
QT-2517 quoteSent16 Aug 202615 Sep 2026$9,028.80

Move it along

Allowed next steps only. The lifecycle is enforced, so a job can never be in two states at once.

Detail

Logged
12 Aug 2026 by email
Quoted
16 Aug 2026
Booked
Completed
Invoiced
Paid
Lead
Dave Nguyen
Category
Switchboard
Terms
30 days
Origin
migrated history

What happened

  • 16 Aug 2026 · DN
    Quote issued
  • 12 Aug 2026 · SW