J-1644 · Additional power points

Maroubra Constructions Pty Ltd · 812 Anzac Parade, Maroubra
Invoiced

What the job is

Anzac Pde townhouses — two doubles in the study, one in the garage.

Priced from the catalogue

CodeDescriptionQtyUnitAmount
GPO-DDouble power point 10A, white5$24.00$120.00
TPS-2.5TPS twin & earth 2.5mm, 100m roll1$195.00$195.00
RCBO-20RCBO 20A 30mA, single pole1$65.00$65.00
LAB-ELECElectricianlabour4$125.00$500.00
Subtotal$880.00
GST$88.00
Total inc GST$968.00
Estimated cost / margin$428.00 · 51%

Paperwork

DocumentStatusIssuedDue / valid toTotal
INV-4437 invoiceSent2 Sep 20262 Oct 2026$997.04

Move it along

Allowed next steps only. The lifecycle is enforced, so a job can never be in two states at once.

Detail

Logged
7 Aug 2026 by phone
Quoted
Booked
25 Aug 2026
Completed
25 Aug 2026
Invoiced
2 Sep 2026
Paid
Lead
Mick Farrelly
Category
Power
Terms
30 days
Origin
migrated history

Who is on it

MF Mick FarrellyTue 25 Aug2h

What happened

  • 2 Sep 2026 · PR
    Invoice raised
  • 25 Aug 2026 · MF
    Work completed by MF
  • 25 Aug 2026 · SW
    Booked in for 2026-08-25
  • 7 Aug 2026 · SW
    Enquiry received by phone